“It’s Like We Have A New House”
Over the past week, a lot of things have been done to our house. First, I finally finished the drywall in the basement and have started working on installing baseboards. I also managed to get the doors hung but one of them is a bit tweaked so I’ll need to spend some time working on getting it corrected.
I’m hoping to have everything finished by the time that Chelsea gets married a the end of the month. That gives me three weeks to finish baseboards, prime and paint the walls, and get flooring installed. I’ll also need to get doorknobs and window coverings installed but that’s about it. It’s so nice to finally be able to see a light at the end of the tunnel that doesn’t resemble an oncoming train.